Composites One Railhead Industrial Site (Westport 27)

Recommend
Share
Tagged in

COMPOSITES ONE RAILHEAD INDUSTRIAL SITE (WESTPORT 27)

divider
Location
Haslet, Texas
Client
Hillwood Development Company
Size
60K SF
Peloton Land Solutions, a Westwood company performed the entitlement and site civil engineering design - including water, sanitary sewer, and storm drain design - for this 60K SF distribution center with employee parking lot, truck court, and driveway connections. The building is located on a 7.8-acre tract in the Alliance Westport industrial development area in the City of Haslet and includes a 135-foot truck court with nine dock doors and 50+ car parking spaces. Our team worked closely with the Alliance Development Review Board to incorporate the required design standards while also maintaining and meeting the City of Haslet development requirements. Our planners provided site planning, circulation and functionality studies, and schematic berm grading design, and conducted landscape inspections.
GAIN GROUND: Peloton Land Solutions, a Westwood company designed a unique storm drain system to efficiently drain the site which involved utilizing the truck court as detention to minimize storm drain pipe sizes and therefore construction costs.
Photos courtesy of Hillwood Properties
Info