Cedar St / Utah Dr – Street Reconstruction

Recommend
Share
Tagged in

CEDAR ST / UTAH DR - STREET RECONSTRUCTION

divider
Location
Celina, Texas
Client
City of Celina
Size
Street Reconstruction

During implementation of Celina’s drainage master plan, our design team and City staff saw opportunity to reconstruct Cedar Street, replacing the existing asphalt residential street with a concrete roadway section with curb and gutter. This roadway reconstruction meets new city standards and allowed conversion of the existing open channel drainage system (front yard ditches) to an enclosed system on both Cedar Street and Utah Drive. This closed drainage system was designed to incorporate all future upstream drainage connections. Peloton Land Solutions, a Westwood company paid close attention to the existing intersections and residential driveway connections, and coordinated with City Staff, residents, and contractors for construction phasing and temporary road closures. In addition, the project included the replacement of an undersized water distribution main and replacement of an undersized sanitary sewer main (upsized from 15” to 21” diameter).

Info