Vantage Southcliff Drill Site

  • Vantage Construction
  • Vantage Southcliff 1
  • Vantage Sunset
  • Vantage Southcliff 2
Recommend
Share
Tagged in
[vc_row][vc_column][vc_column_text]

VANTAGE SOUTHCLIFF DRILL SITE

divider
Location
Fort Worth, Texas
Client
Vantage Fort Worth Energy
Size
5.5 acres
The Vantage Southcliff Drill Site, located at the intersection of I-20 and Granbury Road in Fort Worth, is designed to accommodate approximately 32 natural gas wells and associated equipment. This site is representative of many urban drill sites within the Barnett Shale gas field. Peloton Land Solutions, a Westwood company provided construction administration services for the demolition of five existing commercial buildings and abandonment of private utilities that were located within the drill site perimeter. Our services included site feasibility, site layout, surveying, civil engineering, preparation and submittal of applications for drilling permits, and construction administration. Our team also provided civil engineering services in the design of a 12-inch public water line necessary to serve the site. Peloton Land Solutions, a Westwood company represented Vantage at Fort Worth city council meetings resulting in approval of the site.
  • Barnett Shale urban drill site
  • Site feasibility/layout
  • Surveying
  • Civil engineering design
  • Construction administration
Photos courtesy of Robin Frye[/vc_column_text][/vc_column][/vc_row]
Info