Location
Fort Worth, Texas
Client
Hillwood Development Company
Size
6,200 linear feet of roadway relocation; 2,000 linear feet of 4-lane arterial; utilities
North Beach Street is a principal arterial that provides mobility from just southeast of downtown Fort Worth to the AllianceTexas area. To serve the continued expansion of Hillwood Development Company’s industrial portfolio in North Fort Worth, Peloton provided civil engineering and survey services for a portion of North Beach Street. Services included engineering design and project management for 6,200 linear feet of roadway relocation; 2,000 linear feet of 4-lane divided arterial; 2,000 linear feet of 12” water line; and 2,500 linear feet of 8” sanitary sewer line. Peloton also provided topographic survey, platting, right-of-way dedication documents, drainage analysis, and culvert design. Peloton coordinated relocation of utilities with franchise utility companies and managed the right-of-way vacation and temporary relocation of an existing roadway.
  • Principal arterial roadway
  • Utility design
  • Drainage analysis/design
Info